|
□::Shengli
2 General Situation::□ |
|
Sort |
Information |
Shengli
2 Close Shot |
|
Platform |
Shengli
2
swamp Drilling Barge
|
 |
|
|
□::Main
Size::□ |
|
Overall
Length: 75.24m |
Overall Width: 43.14m
|
|
|
Mat
Length: 72.00m |
Mat
Width:42.50m |
Mat
High:2.50m |
|
Deck
Length: 72.00m |
Deck
Width:42.50m |
|
|
|
□::Design
Standard::□
|
|
Max. Operation
Water Depth: 6.8m |
Max. Drilling Depth:
7000m |
|
|
□::Storage
Capacity::□
|
|
Fuel:
160T |
Drill Water: 200 T |
Fresh
Water: 240T |
|
| Bulk
Tank:490T |
|
□::Max.
Variable Load::□
|
|
Rig
Drilling: 1280T |
Rig
Towing: 769T |
|
|
□::Rig
Floor Load::□
|
|
Hook
Load: 450T |
Rotary
Table: 450T |
|
|
□::Lodging::□ |
| 94 Beds Available |
|
□::Main
Engine::□
|
|
Main
Engine: |
4sets CAT3516
|
1100KW |
1000
rpm |
|
|
|
Generator:
|
4sets SR4B
|
1485KVA |
1000
rpm |
600V |
|
|
|
Emergency Engine: |
1set KTA19-G2(MF) |
336KW |
1500
rpm |
|
|
|
Emergency Generator: |
1set IFC2
352-4SB42 |
400KVA |
1500
rpm |
|
|
|
|
|
□::Drilling
Equipments::□
|
|
Drawworks: |
JC-70D |
7000m |
1470Kw |
Mast: |
HJJ500/47-T1 |
480T |
|
|
|
Travelling
Block: |
YC-450 |
450T |
Crown Block: |
TC8-450 |
450T
|
|
|
|
Mud
Pump: |
SL3NB-1600A |
1600Hp |
Rotary Table: |
ZP-375 |
450T
|
|
|
|
|
□::Well
Control System::□
|
|
BOP:
|
1set Double Ram |
FZ35-35/70 |
35Mpa |
| |
1set
Annular Ram |
2FZ35-70 |
35Mpa |
| |
1set single Ram |
FZ35-70 |
35Mpa |
|
|
□::Solid
Control System::□
|
|
Shale
Shaker: |
2sets |
GJZS-1
|
|
|
□::MISC::□
|
|
Crane: |
2sets
YQHG2240-35T-10M |
| |
|
|
|
|
|