|
□::Shengli
3 General Situation::□ |
| Sort |
Information |
Shengli
3 Close Shot |
|
Platform |
Shengli3 Swamp Drilling Barge |
 |
|
Design |
China Shipping
Industry |
|
Corporation |
|
Built |
Oct.
1988 |
|
CCS |
Ship’
Classification |
|
|
□::Main
Size::□ |
|
External Body: |
|
|
|
Overall
Length: 77.82m |
Overall Width: 39.50m
|
|
|
Mat
Length: 68.40m |
Mat
Width:39.00m |
Mat
High:3.00m |
|
Deck
Length: 72.70m |
Deck
Width:38.20m |
Drill
Slot: 6mx11.4m |
|
|
□::Design
Standard::□
|
|
Max. Operation
Water Depth: 9.0m |
Max. Drilling Depth:
6000m |
|
|
□::Storage
Capacity::□
|
|
Fuel:
398m3 |
Drill Water: 845 m3 |
Fresh
Water: 400 m3 |
|
|
Bulk
Tank: 140 m3 +280 m3 |
|
□::Max.
Variable Load::□
|
|
Rig
Drilling: 250T |
Rig
Towing: 1032.54T |
|
|
□::Rig
Floor Load::□
|
|
|
|
□::Lodging::□ |
| 85
Beds Available |
|
□::Main
Engine::□
|
|
Main
Engine: |
5sets CAT3516DITA
|
1084KW |
1000
rpm |
|
|
|
Generator: |
5sets GE-ATI |
660KW |
1000rpm |
600V |
|
|
|
Emergency Engine: |
1set CAT3406B |
222KW |
1500
rpm |
|
|
|
Emergency Generator: |
1set CAT SR-4 |
200KW |
400V |
|
|
|
|
□::Drilling
Equipments::□
|
|
|
|
Top
Drive: |
PTD500-AC |
350T |
Mud Pump: |
2sets
F-1600 1193KW |
|
|
|
Crown
Block: |
583T |
Rotary
Table: |
T-3750 |
|
|
|
|
□::Well
Control System::□
|
|
BOP
Control System: |
SUPER-T |
56.8LX20 |
21MPA |
|
|
□::Solid
Control System::□
|
|
Shale
Shaker: |
1sets
COBRA-S |
|
|
|
|
Desander: |
1Set ZCSQ-250*A |
|
|
|
|
Desilter: |
1Set
ZLN-120X8 |
160M3/H |
|
|
|
Degaser: |
1Set 225 |
114L/min |
|
|
|
|
□::MISC::□
|
|
|