□::Shengli
5 General Situation::□ |
|
Sort |
Information |
Shengli
5 Close Shot |
| Platform |
Shengli5 Jack-up Drilling Rig |
 |
| Built |
Baker
Company, USA. 1981 |
| Rebuilt |
May. 2000 |
| CCS |
Ship’
Classification |
|
|
□::Main
Size::□ |
|
External Body: |
|
|
|
Overall
Length: 39.62m |
Overall Width: 30.48m
|
|
|
Overall
Depth: 4.11m |
Leg
Length: 48.16m |
Leg
Quantity: 4 |
|
Drill Slot: 10.44mX 8.3m |
|
|
|
|
□::Design
Standard::□
|
|
Max.Othe operation
Water Depth:15m |
Max.Drilling
Depth:6000m |
|
|
Wind Speed:36m/s |
Leg Penetration:3.05m |
|
|
□::Storage
Capacity::□
|
|
Fuel:
300m3 |
Drill Water: 300m3 |
Fresh
Water: 150 m3 |
|
| Bulk
Tank: 94 m3 + 94 m3
|
|
□::Max.
Variable Load::□
|
|
Rig
Drilling: 1162.76T |
Rig
Towing: 144.44T |
Rig Jacking up:
125.42T |
|
□::Rig
Floor Load::□
|
|
Hook
Load: 550T |
Rotary
Table: 5850KN |
|
|
□::Lodging::□ |
| 75
Beds Available |
|
□::Main
Engine::□
|
|
Engine: |
4 sets 3512B |
Caterpillar |
1102KW |
1200rpm |
|
Generator: |
4
sets SR4 |
Caterpillar |
1450KVA |
600v
1683A |
|
|
□::Drilling
Equipments::□
|
|
Drawworks: |
JC-60D |
2000HP |
6000m |
|
|
|
Travelling
Block: |
55T-660 550T |
Mast: |
9.1x 9.1x 44.8M |
|
|
|
Mud Pump: |
F-1600 1600HP Top
Drive: IDS-1 500T |
|
|
|
Crown
Block: |
TC450 450T |
Rotary
Table: |
ZP375 |
|
|
|
|
□::Well
Control System::□
|
|
BOP: |
|
1
set SFZ1310A Single Pipe Ram 70Mpa |
|
1
set SFZ1310 Double Ram 70Mpa |
|
1
set FW1305 Annular Ram 35Mpa |
| BOP
Control System: FKQ6406 |
|
|
□::Solid
Control System::□
|
|
Shale
Shaker: |
2sets
COBRA-S |
L×W×H=96"×68"×72"
2.5Kw1800rpm |
|
|
|
Desander: |
1Set ZCNQ
|
0.2-0.4Mpa 120M3/H |
|
|
|
Desilter: |
1Set
ZCNQ |
0.2-0.4Mpa |
|
|
|
|
□::MISC::□
|
|
|