|
□::Shengli
7 General Situation::□ |
|
Sort |
Information |
Shengli
7 Close Shot |
| Platform |
Shengli 7 Jack-up Drilling Rig |
 |
| Design |
C.F.E.M.
France |
| Built |
FOS-SUR-MER.
France, 1982 |
| Rebuilt |
Aug. 1997 |
| CCS |
Ship’
Classification |
|
|
□::Main
Size::□ |
|
External Body: |
|
|
|
Overall
Length: 44.0m |
Overall Width: 32.2m
|
|
|
Overall
Depth: 5.2m |
Leg
Length: 70m |
Leg
Quantity: 3 |
|
Drill
Slot: 9m X 10m |
|
|
|
|
□::Design
Standard::□
|
|
Max.Othe operation
Water Depth:30m |
Max.Drilling
Depth:5000m |
|
| Leg Penetration:5-20m
|
Wind Speed:
36m/s |
|
|
□::Storage
Capacity::□
|
|
Fuel:
132m3 |
Fresh Water: 132m3 |
|
|
□::Max.
Variable Load::□
|
|
Rig
Drilling: 4500T |
Rig
Towing: 258.95T |
|
|
□::Rig
Floor Load::□
|
|
Hook
Load: 500T |
Rotary
Table: 450T |
|
|
□::Lodging::□ |
| 87 Beds Available |
|
□::Main
Engine::□
|
|
Engine: |
4
sets TBD620V12 1376KM 1500rpm |
|
Generator: |
4
sets IFC2564-4SB92 |
1700KVA
AC600V 50 Hz |
|
Emergency Engine: |
TBD604BL6 |
450KW
1500rpm |
|
|
Emergency Generator: |
IFC5406-4TA42-Z |
58KVA 50Hz |
|
|
|
□::Drilling
Equipments::□
|
|
Drawworks: |
JC-50D |
Mast: |
9.1X9.1X44.8M
330T |
|
Crown
Block: |
TC450-11 |
Mud Pump: |
F-1600 1193KW |
|
Rotary Table: |
ZP-375 450T 600Hp 250rpm |
|
Travelling
Block: |
G-500 500T |
|
|
□::Well
Control System::□
|
|
BOP: MB100-11SB3 |
|
1
set Double Ram |
69Mpa |
|
1
set Single Pipe Ram |
69Mpa |
|
1
set Annular Ram |
34.5Mpa |
|
BOP
Control System: |
FKQ6406A 0.65-0.8Mpa |
|
|
|
□::Solid
Control System::□
|
|
Shale
Shaker: |
2 sets SSZSII 50L/S |
|
Desander: |
1 set TCSQ225
0.5Mpa |
| Desilter: |
1
set ZCN120*60 |
|
|
|
Degaser: |
1 set ZCQ 18.5KW |
|
|
|
□::MISC.::□
|
|
Crane: |
2 Sets |
Larboard
|
10T-15M |
| |
|
Starboard
|
15T |
|