□::Shengli 10 General Situation::□

 Constructed in June, 2010
 Water depth: 164'
 Drilling depth rating: 23,000'
 Three(3) F1600 mud pumps
 Drawworks: 2,175 HP
 Top drive: HDQ70/4500DB
 
Quarters for 100 personnel

胜利九号平台近景

□::General Information::□

 Drilling Vessel Description:
 Designed by Sinopec Shengli Drilling Technology Research
 Institute, Constructed by Dalian Shipbuilding Industry
 Co. LTD  
 Type: Independent Leg Cantilever Jackup
 Class: ★CCS-Drilling
□::Main dimensions (ft)::
  length : 177'
  width  : 171'
  Depth  : 18'
  Legs: Three(3)11.5ft×262ft, tubular
  Leg spacing: longitudinal leg centers:
  135ft; latitudinal leg centers:128ft
  Cantilever: Capable of extending 39' beyond hull's    
stern transom; Drill floor, skids transversely 12'from
center, port or starboard; Entire cantilever and drill
floor designed to skid off the hull to facilitate work
on large platforms or remote well bays.
  Spudcans: 36ft subtense octagon×6.4ft high

 □::Max Operating Environment::□

Design Operating Conditions:
  Maximum water depth (non-hurricane) ........164ft
  Drilling depth..............................23,000ft
Maximum Operating/Environment Conditions:
Normal Drilling:
  variable deck load.........................4,070kp
  Drilling load..............................4,079kp
  Wind speed.................................118knots
  Wave height................................25ft
Hurricane Survival:
  Water depth................................264ft
  Variable load .............................2,955kp
  Wind speed ................................169ft/s
  Wave height ...............................31ft

□::Storage Capacity::□

Weight material and cement:
   Bulk barite...............................6,350ft³
   Bulk cement...............................5,297ft³
   Sacks.....................................10,400
Liquids:  
   Drilling mud..............................1,472 bbl
   Drill water ..............................6,275 bbl
   Diesel fuel ..............................2,820 bbl
   Potable water ............................3,300 bbl

□::Main Equipments::□

Engine Generator Units:
⊙Four(4)CAT3516 B,2,300HP, 1,500RPM,600V,50HZ,3ph
⊙Four(4)CAT SR4B, 2,100HP,1,500RPM,600V
Drawworks: HJC70DB,2,175HP,7,000M
Derrick:  HJJ450/47Y,Static hook load;1,314kp
Mud Pumps: Two(2)F-1600, 1,600HP
Rotary:    C-375,37.5" opening
Top Drive:  HDQ70/4500DB,rated load:4,500kn
Ezy-Torque:  145kn.m(hydraulic cathead)
Cementing Unit: PCS-421B,672GPM,7,000PSI
Elevating System: Operation board: CONSOLE MODEL-39
Solids Control:
Shale Shaker: Three(3)FLC-504,920gpm
Desander: ZHCNS880GPM
Desilter: ZHCNS880GPM
Degasser: ZCQ300,1,320GPM
Cranes: Two(2)35T-10M/5T-35M/8T-33M
BOP Equipment:
Annular: 13-5/8' FZ35- 35/70(5,000psi)
Single: 13-5/8' FZ35-70(5,000-10,000psi)
Double: 13-5/8' 2FZ35-70(5,000-10,000psi)
Choke Manifold: HJGYS.Y-70II

□::Helideck::□

  67.3×62ft. Rated for bell-212 Helicopter
 
 

Copyright : Shengli Offshore Drilling Company
Tel:(0546)8730037 Fax:(0546)8739490 E-mail : slodc@slof.com